"How much will it cost?" is the first question every homeowner asks, and the honest answer is always "it depends." That answer is useless unless you know what it depends on. This guide gives you national reference numbers, explains why projects in Weston and the rest of South Florida often land above them, and shows you how to build a realistic budget before you call a contractor.
Start with national benchmarks — then adjust them
The most widely cited source for remodeling prices in the United States is the annual Cost vs. Value report published by the Journal of Light Construction and Zonda. It prices the same standardized projects across more than one hundred U.S. markets. The 2025 national averages are a useful starting point:
- Minor kitchen remodel (midrange): about $28,500. New cabinet fronts, counters, sink, faucet, appliances and flooring, without changing the layout.
- Major kitchen remodel (midrange): about $82,800. New layout, new cabinets, island, appliances, lighting and flooring.
- Major kitchen remodel (upscale): about $164,100. Custom cabinetry, stone counters, high-end appliances and lighting.
- Bathroom remodel (midrange): about $26,100 for a standard 5-by-7-foot bathroom.
- Bathroom remodel (upscale): about $81,600 for an expanded bathroom with high-end finishes.
These numbers describe a specific scope, in an average market, built by a contractor who pulls permits and carries insurance. They are not quotes. Treat them as a sanity check: if a proposal for a full kitchen gut is a fraction of the national midrange figure, something is missing from the scope.
Why South Florida projects often cost more
Hurricane code and product approvals
Broward and Miami-Dade counties sit inside the High-Velocity Hurricane Zone, where design wind speeds are among the highest in the country. Any project that touches windows, exterior doors, roofing or structure must use products approved for that zone and pass stricter inspections. Impact-rated openings cost more than standard ones, and engineering is often required. Read more in our guide to Florida Building Code hurricane requirements.
Permits, HOA review and timelines
Most Weston homes belong to a homeowners association with its own architectural review. Permits, plan reviews and association approvals add soft costs and calendar time. Delays matter because every extra week on site costs money. Our Broward County permit guide explains the process.
Labor and insurance
Skilled trades are in high demand across South Florida, and contractor insurance — general liability and workers' compensation — is expensive in this state. Licensed, insured contractors carry those costs; a price that seems too low often means one of them is missing.
Age of the housing stock
Many Weston homes were built between the mid-1980s and the early 2000s. Opening walls in a house of that age frequently reveals items that must be brought up to current code: undersized electrical service, missing GFCI or AFCI protection, and in some homes, polybutylene water lines that should be replaced. These are not upsells; they are conditions that an inspector will require or that will fail later.
Room by room: what drives the price
Kitchens
The single biggest decision is whether the layout stays the same. Keeping the sink, range and refrigerator where they are avoids most plumbing, gas and electrical changes. Moving them — or removing a wall to open the kitchen — adds engineering, rough-in work, inspections and drywall repairs. After layout, the next drivers are cabinetry (stock, semi-custom or custom), countertop material and the appliance package. See our kitchen remodeling service for how we plan this.
Bathrooms
Bathrooms are small but dense: plumbing, waterproofing, tile, glass, ventilation and lighting all fit into a few square feet. Converting a tub into a curbless walk-in shower requires recessing or sloping the floor and a continuous waterproof membrane, which costs more than replacing a tub in place. Large-format tile and frameless glass add both material and labor cost. Learn more on our bathroom remodeling page.
Whole-home renovations
Renovating the whole house at once usually costs less per room than separate projects over several years, because permits, demolition, mobilization and trades are shared. The total, however, is larger, and the budget must include systems — electrical, plumbing, air conditioning — that are invisible once finished. A whole-home budget should always include a contingency for conditions found behind walls.
How to read a remodeling estimate
A trustworthy estimate is specific enough to compare. Look for:
- Line items by phase or trade — demolition, framing, plumbing, electrical, drywall, tile, cabinetry, paint. A single lump sum hides where the money goes.
- Allowances clearly identified — if you have not chosen tile or fixtures yet, the estimate should state the allowance per square foot or per item. Low allowances make a bid look cheaper until you start choosing finishes.
- Permits and inspections included — and who is responsible for pulling them.
- Exclusions — what is not included, such as appliances, furniture moving or repairs to hidden damage.
- A payment schedule tied to progress — not to dates. In Florida, a contractor who takes more than 10% of the contract price as an initial payment on residential work must apply for permits within 30 days and start work within 90 days after permits are issued, unless you agree otherwise in writing.
Building your budget
We recommend a simple three-part budget:
- Construction cost from a detailed estimate based on a site visit.
- Selections — the real price of the finishes you want, compared against the allowances.
- Contingency — 10% for kitchens and bathrooms in newer homes, more for older homes or whole-house projects.
Add the costs that do not appear in a contractor's price: temporary living arrangements during a whole-home renovation, eating out while the kitchen is closed, and furniture or window treatments for the new space.
Is remodeling a good investment?
Remodeling rarely returns its full cost at resale. In the 2025 Cost vs. Value data, a midrange minor kitchen remodel recouped more than its cost nationally, while major kitchen and upscale bathroom remodels recouped roughly half or less. The financial case for a large remodel is usually about living better in the home for years — not about flipping the investment back immediately. If you are deciding between renovating and moving, read Remodel or Sell? How Weston Homeowners Can Run the Numbers.
Get a number for your home
National averages are a starting point; your home, your layout and your finishes determine the real price. We visit the property and prepare a project proposal for homes in Weston and across Broward County. Request your estimate and we will walk through the project with you.